The experiment uses the phase-controlled cycloconverter as the frequency changer, stepping up 50/3Hz electricity to 50Hz electricity and supplying it to the utility grid. Thus, a new flexible ac transmission system device is successfully established in this experiment. The synchronizing process of 50/3Hz transmission system with 50Hz utility system is introduced in this paper. The experiment results show that a 1200km/500kv transmission line can transmit more than 2000MW electric power when employing the FFTS. The experiment also illustrates that there is no essential difficulty to realize FFTS in engineering practice.